The external ROV inspections along the entire length of Line 1 took place from mid-June through mid-October 2012. This was...
This intelligent Pipeline Inspection Gauge (PIG) was specifically developed for the Nord Stream Pipelines by Rosen Integrity...
At the Russian landfall facility, in Portovaya Bay near Vyborg, the powerful Portovaya Compressor Station builds the...
The operation of the Nord Stream Pipeline system is remotely monitored and controlled from the Control Centre in the Nord...
The operation of the pipelines is overseen from the Control Centre at the Nord Stream headquarters in Zug. Operators are in...
Generel baggrundsinformation om Nord Stream
Flere kontakter
Informationen på vores hjemmeside er efter vores bedste overbevisning korrekt på det tidspunkt, hvor informationerne bliver offentliggjort. Imidlertid påtager Nord Stream AG sig ikke ansvar for rigtigheden af indholdet på denne hjemmeside.
Mere