Um unsere Webseite für Sie optimal zu gestalten und fortlaufend verbessern zu können, verwenden wir Cookies. Durch die weitere Nutzung der Webseite stimmen Sie der Verwendung von Cookies zu. Weitere Informationen zu Cookies erhalten Sie in unseren Nutzungsbedingungen. OK

Bilder

Zurück zur Suche

Castoro Sei Stinger

In February 2010 at the Port of Rotterdam, the Castoro Sei (C6) was fitted with a new stinger (external ramp) for the Nord Stream project. This pictures shows the stinger (white) before it was installed.
The stinger is attached to the bow of the pipelay vessel and supports the pipeline during laying. This way, stress on the pipeline during laying is controlled and remains acceptable limits The pipelay parameters will be controlled at all times so that the tension remains within the limits determined by the installation engineering analysis at all times. Please note: The stinger is attached to the bow of the Castoro Sei - she actually moves backwards during pipelaying, with the stern facing forward!

Kategorien

Schiffe › Castoro Sei

Quelle

Nord Stream AG

Datum

20. Februar 2010

Downloads

Dateityp Auflösung Dateigröße Bildgröße Farbraum
JPG 300 dpi 16.3 MB 3543 px × 2362 px CMYK Download
JPG 300 dpi 4.5 MB 3543 px × 2362 px RGB Download
JPG 72 dpi 1.1 MB 1400 px × 933 px RGB Download

Nutzungsbedingungen

Die Informationen auf unserer Website sind zum Zeitpunkt ihrer Veröffentlichung nach unserem Wissensstand korrekt. Die Nord Stream AG übernimmt jedoch ausdrücklich keine Haftung für die Richtigkeit oder Vollständigkeit der auf der Website bereitgestellten Inhalte.

Weiterlesen