Bilder
Handling of pipe segments at Mukran, Port of Sassnitz (Rügen Island, Germany), May 2008
Two 12.2-metre long and about 12-ton heavy pipe joints for the Nord Stream pipeline are loaded onto waiting trucks with a so-called "reach stacker". The pipe segments are then transported to the interim stock yard only a few hundred metres away. Since May 2008, one to three trains arrive every weekday in Mukran (R端gen Island, Germany) carrying up to 108 joints each.
Downloads
| Dateityp | Auflösung | Dateigröße | Bildgröße | Farbraum | |
| JPG | 300 dpi | 18.7 MB | 4000 px × 2656 px | CMYK | Download |
| JPG | 300 dpi | 6.0 MB | 4000 px × 2656 px | RGB | Download |
| JPG | 72 dpi | 841.4 KB | 1400 px × 929 px | RGB | Download |
Nutzung mit Quellenvermerk (Nord Stream AG) für redaktionelle Beiträge über Nord Stream gestattet.



