Inspection of the welded pipes with automatic ultrasonic equipment

The Nord Stream pipeline will be made up of high-quality steel pipes with walls ranging in thickness from 41 mm to 27 mm as the pressure drops along the route. They will be sent to specialised coating yards to be coated internally with anti-friction coating and externally with an anti-corrosive and weight coating. From inland storage, the pipes will be taken by pipe carrier to a large pipe-laying vessel, where they will be inspected for possible transport damage.

In a "double-joint welding station", two 12 m pipes will be welded together to a 24 m "double joint", with a welding pass from both inside and outside. Upon completion, the joint will be inspected by ultrasonic testing to identify possible welding defects. Good welds will be covered with an anti-corrosion coating and the double joint lowered to the seabed in a continuous line by pulling the pipe-laying vessel 24 m forward while the pipeline sections are kept under tension over the stinger.

Kategorien

Pipelinebau › Schweißarbeiten

Quelle

Nord Stream AG

Datum

5. Mai 2005

Downloads

Dateityp Auflösung Dateigröße Bildgröße Farbraum
JPG 300 dpi 6.1 MB 2240 px × 1680 px CMYK Download
JPG 300 dpi 2.1 MB 2240 px × 1680 px RGB Download
JPG 72 dpi 1.0 MB 1400 px × 1050 px RGB Download

Nutzungsbedingungen

Die Informationen auf unserer Website sind zum Zeitpunkt ihrer Veröffentlichung nach unserem Wissensstand korrekt. Die Nord Stream AG übernimmt jedoch ausdrücklich keine Haftung für die Richtigkeit oder Vollständigkeit der auf der Website bereitgestellten Inhalte.

Weiterlesen