Bilder
Last Pipe of Line 1 with Attached PIG Launcher Lowered into Water
The PIG (Pipeline Inspection Gauge) launchers are specialised heads attached to the start of the three sections of the pipelines. They house the PIGs that will clean, gauge the sections prior to pres-sure testing.
Downloads
| Dateityp | Auflösung | Dateigröße | Bildgröße | Farbraum | |
| JPG | 300 dpi | 8.9 MB | 2362 px × 1584 px | CMYK | Download |
| JPG | 300 dpi | 2.8 MB | 2362 px × 1584 px | RGB | Download |
| JPG | 72 dpi | 1.0 MB | 1400 px × 938 px | RGB | Download |
Nutzung mit Quellenvermerk (Nord Stream AG) für redaktionelle Beiträge über Nord Stream gestattet.



