Bilder
Underwater Welding on Nord Stream Pipeline Completed
All three sections of the first of Nord Stream's twin pipelines were joined together underwater by hyperbaric tie-ins. Pipe ends that were cut off were retrieved and loaded onto a support vessel. A diamond wire cutter was used to cut through the high-tensile steel.
Kategorien
Pipelinebau › Schweißarbeiten auf dem Meeresgrund
Quelle
Nord Stream AG
Datum
22. Juni 2011
Downloads
| Dateityp | Auflösung | Dateigröße | Bildgröße | Farbraum | |
| JPG | 300 dpi | 20.0 MB | 4000 px × 2669 px | CMYK | Download |
| JPG | 300 dpi | 6.2 MB | 4000 px × 2669 px | RGB | Download |
| JPG | 72 dpi | 1.0 MB | 1400 px × 934 px | RGB | Download |
Nutzung mit Quellenvermerk (Nord Stream AG) für redaktionelle Beiträge über Nord Stream gestattet.



