Footage
Interview: Assembly of the Pipes on board the Castoro Dieci
Catalim Mamaischi, Assistant Superintendent on the Castoro Dieci, describes the challenges faced in constructing a pipeline as big as the Nord Stream Pipeline. Mamaischi talks, while the laybarge’s central assembly line – where the pipes are welded – is shown in the background.
Categories
Pipeline Construction ›
Pipe Laying
Pipeline Construction ›
Welding
Vessels ›
Castoro Dieci
Date
Aug. 30, 2010
Language
English
Duration
1:34
Audio
Yes
Downloads
| H.264 (HD) | 768 × 576 | 14.4 MB | |
| H.264 | 720 × 540 | 13.0 MB | |
| VP8 | 720 × 540 | 11.0 MB | |
| MPEG2 (HD) | 720 × 576 | 331.8 MB |
Videos may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



