Footage
Interview: Deployment of the Castoro Sei
Aboard the Castoro Sei, Andrea Manuni, Assistant Superintendent of Saipem S.p.A., confirms the good collaboration between transport ships and pipelay vessels that is required for the construction of the pipeline. Notably, high safety standards are employed during the laying of the pipeline so that it can remain in operation for a long time.
Categories
Logistics / Pipe Production ›
Pipe Production
Pipeline Construction ›
Pipe Laying
Vessels ›
Castoro Sei
Date
June 26, 2012
Language
English
Duration
1:28
Audio
Yes
Downloads
H.264 (HD) | 1024 × 576 | 21.5 MB | |
H.264 | 720 × 404 | 13.1 MB | |
VP8 | 720 × 404 | 14.5 MB | |
MPEG2 | 1024 × 576 | 174.7 MB |
Videos may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.