Footage
Interview: From Loading to Laying – The Solitaire’s Pipeline Laying Process
John B. Wade, Construction Superintendent for the Solitaire, goes into detail about the technical features of the pipelay vessel Solitaire and the precise route that a pipe follows from loading, to processing on board, through to being laid on the Baltic seafloor. Wade also explains the various non-destructive testing procedures employed during welding, and monitoring of the so-called S-Lay procedure that the pipeline is laid with.
Categories
Pipeline Construction ›
Pipe Laying
Pipeline Construction ›
Welding
Vessels ›
Solitaire
Date
Aug. 15, 2010
Language
English
Duration
6:06
Audio
Yes
Downloads
| H.264 (HD) | 1024 × 576 | 87.8 MB | |
| H.264 | 720 × 404 | 46.3 MB | |
| VP8 | 720 × 404 | 60.6 MB | |
| MPEG2 | 1024 × 576 | 853.2 MB |
Videos may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



