Footage
Interview: Retrofitting the Castoro Dieci for Laying the Pipeline
Giacinto Lezza, captain of the Castoro Dieci, talks about required retrofitting measures on the Castoro Dieci so that it will be capable of laying the Nord Stream Pipeline. Later, he goes into safety and the stages of laying the pipeline.
Categories
Pipeline Construction ›
Pipe Laying
Vessels ›
Castoro Dieci
Date
Aug. 30, 2010
Language
English
Duration
1:28
Audio
Yes
Downloads
| H.264 | 720 × 540 | 7.1 MB | |
| VP8 | 720 × 540 | 8.2 MB | |
| H.264 (HD) | 768 × 576 | 8.0 MB | |
| MPEG2 (HD) | 720 × 576 | 313.6 MB |
Videos may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



