We use cookies to continually optimise our website. By continuing to use this website, you agree to the use of cookies. For more information, please see our User Conditions. OK

Footage

Back to Search

Interview: Ship Assignments, Construction and Laying of the Pipeline

Ruurd Hoekstra, Deputy Director Construction for Nord Stream AG, explains how the work was divided among the ships, and the differences between the pipelay vessels: The Castoro Sei was working in Swedish, Finnish, and Danish waters; the Castoro Dieci is designed for work in calm waters, and was laying pipe on the German coast. The Solitaire was laying the pipeline between Russia and Finland. While the Castoro Sei and Castoro Dieci are positioned by anchor, the Solitaire has its own propulsion. Hoekstra also talks about the project process, the monitoring of the welding work, and the pipe tracking system, which allows each individual pipe to be identified and tracked.

Categories

Pipeline Construction › Pipe Laying
Pipeline Construction › Welding
Vessels › Castoro Dieci
Vessels › Castoro Sei
Vessels › Solitaire

Date

Aug. 15, 2010

Language

English

Duration

7:55

Audio

Yes

Downloads

H.264 720 × 540 38.8 MB Download
VP8 720 × 540 47.8 MB Download
H.264 (HD) 768 × 576 44.5 MB Download
MPEG2 (HD) 720 × 576 1.7 GB Download