We use cookies to continually optimise our website. By continuing to use this website, you agree to the use of cookies. For more information, please see our User Conditions. OK

Footage

Back to Search

Laying of the Pipeline by the Castoro Sei – Part 5

Individual pipes are carried on a conveyor belt, the joints are machined, cleaned, and the weld seam is covered in a shrink tubing collar to prevent corrosion. The “double joints” are then lowered into the water.

Categories

Pipeline Construction › Pipe Laying
Pipeline Construction › Welding
Vessels › Castoro Sei

Date

May 15, 2010

Language

No language

Duration

6:57

Audio

Yes

Downloads

H.264 (HD) 768 × 576 189.8 MB Download
H.264 720 × 540 162.1 MB Download
VP8 720 × 540 160.3 MB Download
MPEG2 (HD) 720 × 576 1.5 GB Download