Footage
Laying of the Pipeline by the Castoro Sei – Part 5
Individual pipes are carried on a conveyor belt, the joints are machined, cleaned, and the weld seam is covered in a shrink tubing collar to prevent corrosion. The “double joints” are then lowered into the water.
Categories
Pipeline Construction ›
Pipe Laying
Pipeline Construction ›
Welding
Vessels ›
Castoro Sei
Date
May 15, 2010
Language
No language
Duration
6:57
Audio
Yes
Downloads
| H.264 (HD) | 768 × 576 | 189.8 MB | |
| H.264 | 720 × 540 | 162.1 MB | |
| VP8 | 720 × 540 | 160.3 MB | |
| MPEG2 (HD) | 720 × 576 | 1.5 GB |
Videos may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



