Footage
Logistical Measures from Construction through to Laying the Pipeline
The Nord Stream Pipeline is currently the largest logistics project in the Baltic. The project includes efficient and environmentally friendly logistics plans. After the pipes are produced in Germany and Russia, they are given a concrete coating. They are then stored at five ports in neighbouring Baltic states, and transported to the pipelay vessels from there. Aboard these vessels, the pipes are welded together and laid on the Baltic seabed.
Categories
Logistics / Pipe Production ›
Concrete Coating
Logistics / Pipe Production ›
Marshalling Yards / Harbours
Logistics / Pipe Production ›
Pipe Transport
Logistics / Pipe Production ›
Pipe Production
Date
Oct. 28, 2010
Language
English
Duration
3:38
Audio
Yes
Downloads
| H.264 (HD) | 1024 × 576 | 48.8 MB | |
| VP8 | 720 × 404 | 25.3 MB | |
| H.264 | 720 × 404 | 25.3 MB | |
| MPEG2 | 1024 × 576 | 723.9 MB |
Videos may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



