Footage
Lowering of the Welding Plug
The welding plug is slowly lowered into the water from the ship. During the underwater welding work (Hyperbaric Tie-In, or HTI), it prevents water from the segments from leaking into the dry zone.
Categories
Pipeline Construction › Hyperbaric Tie-In
Date
June 21, 2011
Language
No language
Duration
2:17
Audio
Yes
Downloads
| H.264 | 720 × 404 | 26.9 MB | |
| H.264 (HD) | 1280 × 720 | 63.1 MB | |
| VP8 | 720 × 404 | 27.0 MB | |
| MPEG2 | 1280 × 720 | 133.4 MB |
Videos may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



