We use cookies to continually optimise our website. By continuing to use this website, you agree to the use of cookies. For more information, please see our User Conditions. OK

Footage

Back to Search

Recovery of a PIG Receiver from the Water – Part 2

After the underwater welding of the pipes (Hyperbaric Tie-In, or HTI), the PIG receivers are recovered from the Baltic Sea. PIGs (Pipeline Inspection Gauges) are intelligent inspection devices that are regularly sent through the pipeline in search of corrosion damage and leaks.

Categories

Pipeline Construction › Hyperbaric Tie-In

Date

June 21, 2011

Language

No language

Duration

3:00

Audio

Yes

Downloads

H.264 (HD) 1024 × 576 69.7 MB Download
H.264 720 × 404 36.5 MB Download
VP8 720 × 404 27.5 MB Download
MPEG2 1024 × 576 395.8 MB Download