Images
Anchor Pattern
During construction the Castoro Sei is positioned by means of a 12-point mooring system. This system enables it to maintain accurate positioning. Each of the 12 mooring lines, or anchor lines, are controlled by a tension winch weighing 124 tons. The vessel also features thrusters to further ensure precise positioning.
Categories
Pipeline Construction ›
Graphics / Maps
Graphics / Maps ›
Construction / Pipe Laying
Source
Nord Stream AG
Date
April 8, 2010
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 300 dpi | 330.9 KB | 1528 px × 1068 px | CMYK | Download |
| JPG | 72 dpi | 125.7 KB | 1400 px × 978 px | RGB | Download |
| EPS | 387.1 KB | Download |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



