Images
Castoro Dieci: Welding Station
Before being laid on the seabed the pipes are welded and sealed on the pipelay vessel. Single joints are welded on to the main pipeline in the central assembly line. Each weld undergoes ultrasonic testing.
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 300 dpi | 20.1 MB | 4000 px × 2666 px | CMYK | Download |
| JPG | 300 dpi | 5.7 MB | 4000 px × 2666 px | RGB | Download |
| JPG | 72 dpi | 832.1 KB | 1400 px × 933 px | RGB | Download |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



