Images
Construction site for concrete weight coating and interim stockyard at Kotka
Pipe joints for the construction of the Nord Stream Pipeline have been stored in Kotka (Finland) since June 2008. There, the pipes, which are 12-metrs long are coated with a concrete layer that is 60-110 millimetres thick. The concrete weight coating lends additional weight and thereby stability to the pipeline on the seabed
Categories
Logistics / Pipe Production ›
Concrete Coating
Logistics / Pipe Production ›
Marshalling Yards / Harbours
Source
EUPEC PipeCoatings France S.A.
Date
April 16, 2010
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 300 dpi | 19.1 MB | 4000 px × 3000 px | CMYK | Download |
| JPG | 300 dpi | 5.3 MB | 4000 px × 3000 px | RGB | Download |
| JPG | 72 dpi | 991.5 KB | 1400 px × 1050 px | RGB | Download |



