We use cookies to continually optimise our website. By continuing to use this website, you agree to the use of cookies. For more information, please see our User Conditions. OK

Images 

Back to Search

Gas Begins to Flow through Line 2

On October 8, 2012, gas began to flow through Line 2 of Nord Stream’s twin pipeline system. A push of a button at the control centre at the Gazprom Gas Complex Preparation Station made this possible. The screen above the gentlemen on stage depicts that gas is flowing through Line 2. Together the two pipelines are now capable of delivering 55 billion cubic metres of gas a year to the European gas grid. Nord Stream consortium heads were at the event to celebrate gas flowing through the twin pipeline system. From left to right: Jean-François Cirelli, Vice President, GDF SUEZ; Paul van Gelder, Chairman of the Executive Board and CEO of N.V. Nederlandse Gasunie; Dr. Bernhard Reutersberg, Member of the Management Board of E.ON AG; Dr. Harald Schwager, Member of the Management Board of BASF SE; Sergei Ivanov, Chief of Staff of the Russian Presidential Administration; Alexei Miller, Deputy Chairman of the Board of Directors and Chairman of the Management Committee, OAO Gazprom; Gerhard Schröder, Chairman of the Nord Stream Shareholders’ Committee and Former Chancellor of the Federal Republic of Germany; and Matthias Warnig, Managing Director, Nord Stream AG.

Source

Nord Stream AG

Date

Oct. 8, 2012

Downloads

File Type Resolution File Size Image Size Colorspace
JPG 300 dpi 17.4 MB 4000 px × 2666 px CMYK Download
JPG 300 dpi 5.9 MB 4000 px × 2666 px RGB Download
JPG 72 dpi 704.1 KB 1400 px × 933 px RGB Download