Images
Landfall at the Lubminer Heide energy centre
The first construction phase in the 82 kilometre long German sector of the Nord Stream Pipeline is the landfall at the Lubminer Heide energy centre. In April 2010, the onshore installation of a cofferdam started in the approximately five hectare large area directly adjacent to the field where WINGAS' receiving terminal is to be built.
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 300 dpi | 10.9 MB | 3500 px × 2018 px | CMYK | Download |
| JPG | 300 dpi | 3.2 MB | 3500 px × 2018 px | RGB | Download |
| JPG | 72 dpi | 759.4 KB | 1400 px × 807 px | RGB | Download |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



