Images
Last Section of Line 2 Lowered onto the Seafloor
In the early morning of April 18, 2012, pipe number 99,953, the last pipe of Line 2, was welded onto pipeline, which was lowered onto the seabed off the coast of Gotland, Sweden by the Castoro Sei laybarge. A total of 199,755 pipes were used to form both of the Nord Stream Pipelines.
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 300 dpi | 20.8 MB | 2667 px × 4000 px | CMYK | Download |
| JPG | 300 dpi | 6.5 MB | 2667 px × 4000 px | RGB | Download |
| JPG | 72 dpi | 840.3 KB | 933 px × 1400 px | RGB | Download |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



