We use cookies to continually optimise our website. By continuing to use this website, you agree to the use of cookies. For more information, please see our User Conditions. OK

Images 

Back to Search

Line 2 Lowered onto the Seabed

April 18, 2012: A camera monitors the last section of Line 2 as it leaves the Castoro Sei. A PIG launcher is attached to the pipeline.

PIG (Pipeline Inspection Gauge) launchers are specialised heads attached to the start of the three sections of the pipelines. They house the PIGs that will clean and gauge the sections prior to pressure testing.

Categories

Pipeline Construction › Pipe Laying

Source

Nord Stream AG

Date

April 18, 2012

Downloads

File Type Resolution File Size Image Size Colorspace
JPG 300 dpi 18.0 MB 4000 px × 2666 px CMYK Download
JPG 300 dpi 5.6 MB 4000 px × 2666 px RGB Download
JPG 72 dpi 693.5 KB 1400 px × 933 px RGB Download