Images
PIG launcher at Landfall Germany
In the first half of May 2011, flooding of section three of Line 1 was completed. Once the section had been filled with water, pressure testing started. The PIGs (pipeline inspection gauges) in the train ensured that the whole section was filled with water. Here, the first PIG of the of the PIG train is removed from the PIG launcher, which was temporarily installed at the site of the German landfall in Lubmin.
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 300 dpi | 19.0 MB | 4000 px × 2666 px | CMYK | Download |
| JPG | 300 dpi | 6.7 MB | 4000 px × 2666 px | RGB | Download |
| JPG | 72 dpi | 1023.0 KB | 1400 px × 933 px | RGB | Download |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



