We use cookies to continually optimise our website. By continuing to use this website, you agree to the use of cookies. For more information, please see our User Conditions. OK

Images 

Back to Search

Pipe Carrier Vessel Leaves Kotka Harbour with Pipes

The Toronator pipe carrier vessel holds about 90 concrete coated pipes. At the end of the Nord Stream Project, EUPEC will have loaded out approximately 42,000 pipes from the Kotka marshalling yard to the pipe supply vessels. It takes about three hours to load about 90 pipes into the pipe supply vessel.

Categories

Vessels › Support Vessels

Source

Nord Stream AG

Date

April 15, 2010

Downloads

File Type Resolution File Size Image Size Colorspace
JPG 300 dpi 11.2 MB 3543 px × 2362 px CMYK Download
JPG 300 dpi 4.1 MB 3543 px × 2362 px RGB Download
JPG 72 dpi 711.8 KB 1400 px × 933 px RGB Download