Images
Pipelaying Process 4
The double-joint is moved to the non-destructive testing station where every millimetre of the weld undergoes ultrasonic testing to detect any unacceptable flaws. If required, the defect will be repaired and the weld rescanned to meet international quality standards
Categories
Pipeline Construction ›
Graphics / Maps
Graphics / Maps ›
Construction / Pipe Laying
Source
Nord Stream AG
Date
April 21, 2011
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 72 dpi | 57.9 KB | 827 px × 413 px | CMYK | Download |
| JPG | 72 dpi | 41.7 KB | 827 px × 413 px | RGB | Download |
| EPS | 294.1 KB | Download |



