Images
Pipelaying Process 5
Following non-destructive testing, the double-joint is moved in a pipe elevator to the central assembly line, or "firing line". There, the insides are checked for debris. The ends of the double-joint are then pre-heated in preparation for welding onto the main pipe string.
Categories
Pipeline Construction ›
Graphics / Maps
Graphics / Maps ›
Construction / Pipe Laying
Source
Nord Stream AG
Date
April 21, 2011
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 72 dpi | 61.8 KB | 827 px × 413 px | CMYK | Download |
| JPG | 72 dpi | 49.3 KB | 827 px × 413 px | RGB | Download |
| EPS | 612.6 KB | Download |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



