Images
Pipeline Strings Are Laid in Trench
On 4 August 2010 the second pipeline string surfaced from the water at the Russian landfall in Portovaya Bay. Both strings were pulled ashore from the pipelay vessel Castoro Sei, moored approximately one kilometre away from the shoreline. The first string was pulled ashore on 28 July.
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 300 dpi | 17.4 MB | 3888 px × 2592 px | CMYK | Download |
| JPG | 300 dpi | 5.0 MB | 3888 px × 2592 px | RGB | Download |
| JPG | 72 dpi | 887.4 KB | 1400 px × 933 px | RGB | Download |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



