Images
Pressure Testing Step 1: Flooding of Section Two
Pressure testing of Line 1 starts at KP 675. Filtered seawater is pumped into this section. The PIGs (pipeline inspection gauges) are launched and travel to KP 297 at a minimum speed of half a metre per second. The PIGs will ensure that section two is completely flooded.
Categories
Pipeline Construction ›
Graphics / Maps
Graphics / Maps ›
Pressure Testing
Source
Nord Stream AG
Date
May 16, 2011
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 72 dpi | 323.6 KB | 1181 px × 709 px | CMYK | Download |
| JPG | 72 dpi | 126.7 KB | 1181 px × 709 px | RGB | Download |
| EPS | 1.0 MB | Download |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



