Pressure Testing Step 2: Flooding Section One
After section two has been flooded, cleaned and gauged, the ship moves to KP 297, where the process of PIG launching and flooding of section one takes place. At the same time, the vessel pressurises section two. The test pressure is higher than the operating pressure.