We use cookies to continually optimise our website. By continuing to use this website, you agree to the use of cookies. For more information, please see our User Conditions. OK

Images 

Back to Search

Ship-to-Ship Transport in Slite, Sweden

The last pipe transhipment to the pipelay vessel Castoro Sei from the Swedish port of Slite took place on April 18, 2012. About 56,000 pipes were shipped to Slite from Mukran, Germany from 2010 through 2012. A ship-to-ship system was developed for this port as the quay was not large enough to store many pipes. With this system, pipes delivered by sea from Mukran, Germany where transferred directly to a smaller transport ship situated on the opposite side of the pier.

Categories

Logistics / Pipe Production › Marshalling Yards / Harbours

Source

Nord Stream AG

Date

April 25, 2012

Downloads

File Type Resolution File Size Image Size Colorspace
JPG 300 dpi 20.6 MB 4000 px × 2666 px CMYK Download
JPG 300 dpi 6.0 MB 4000 px × 2666 px RGB Download
JPG 72 dpi 738.5 KB 1400 px × 933 px RGB Download