Images
Solitaire Lowering the Last Pipe
The last pipe of Line 2 laid by Allsea's Solitaire is lowered onto the seabed with the PIG launcher attached to the pipe. The vessel laid 342.5 kilometres of each of the two lines of the Nord Stream Pipeline. Nord Stream will start transporting natural gas from Russia to the European Union in the last quarter of 2011.
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 300 dpi | 23.4 MB | 2666 px × 4000 px | CMYK | Download |
| JPG | 300 dpi | 7.3 MB | 2666 px × 4000 px | RGB | Download |
| JPG | 72 dpi | 1.0 MB | 933 px × 1400 px | RGB | Download |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



