We use cookies to continually optimise our website. By continuing to use this website, you agree to the use of cookies. For more information, please see our User Conditions. OK

Images 

Back to Search

Solitaire Lowering the Last Pipe

The last pipe of Line 2 laid by Allsea's Solitaire is lowered onto the seabed with the PIG launcher attached to the pipe. The vessel laid 342.5 kilometres of each of the two lines of the Nord Stream Pipeline. Nord Stream will start transporting natural gas from Russia to the European Union in the last quarter of 2011.

Categories

Pipeline Construction › Pipe Laying

Source

Nord Stream AG

Date

Aug. 16, 2011

Downloads

File Type Resolution File Size Image Size Colorspace
JPG 300 dpi 23.4 MB 2666 px × 4000 px CMYK Download
JPG 300 dpi 7.3 MB 2666 px × 4000 px RGB Download
JPG 72 dpi 1.0 MB 933 px × 1400 px RGB Download