Images
Temporary PIG Trap at the German Landfall
During the pre-commissioning phase (from the beginning of May to the beginning of July 2011), a temporary pipeline inspection gauge trap was installed at the end of Line 1 of the Nord Stream Pipeline in Lubmin, Germany.
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 300 dpi | 21.8 MB | 4000 px × 2666 px | CMYK | Download |
| JPG | 300 dpi | 8.0 MB | 4000 px × 2666 px | RGB | Download |
| JPG | 72 dpi | 1.1 MB | 1400 px × 933 px | RGB | Download |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



