Images
Tie-In Sequence 7: Retracting the Welding Equipment
Once the welds are inspected and approved, the habitat is retriebed back onboard the vessel. Using the PHFs, the pipeline is lowered onto the seabed, and a remotely operated vehicle surveys the area.
Categories
Pipeline Construction ›
Graphics / Maps
Graphics / Maps ›
Hyperbaric Tie-In
Source
Nord Stream AG
Date
April 21, 2011
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 72 dpi | 333.3 KB | 800 px × 480 px | CMYK | Download |
| JPG | 72 dpi | 114.3 KB | 800 px × 480 px | RGB | Download |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



