Images
Welding
In the firing line of the Castoro Sei (C6), double joints are welded to the end of the pipeline using a semi-automatic system. Afterwards, every millimetre of each weld area is thoroughly examined by automated ultrasonic testing (AUT). The pipes in this photo, which are not weight coated, are being welded together to test the equipment. This took place while the C6 was being retrofitted in the Port of Rotterdam in February 2010 for the Nord Stream project.
Downloads
| File Type | Resolution | File Size | Image Size | Colorspace | |
| JPG | 300 dpi | 12.1 MB | 2362 px × 3543 px | CMYK | Download |
| JPG | 300 dpi | 3.2 MB | 2362 px × 3543 px | RGB | Download |
| JPG | 72 dpi | 799.5 KB | 933 px × 1400 px | RGB | Download |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



