Фотоматериалы
Bevelling
Before the pipes can be welded its ends have to be machined. On board the C6, which was docked at the Port of Rotterdam in February 2010 for retrofitting, test pipes without concrete weight coating were bevelled to test the equipment. The photo shows a pipe following bevelling.
Загрузки
| Тип файла | Разрешение | Размер файла | Размер изображения | Цветопередача | |
| JPG | 300 точек на дюйм | 13.2 Mб | 3543 px × 2362 px | Формат CMYK | Загрузить |
| JPG | 300 точек на дюйм | 3.5 Mб | 3543 px × 2362 px | Формат RGB | Загрузить |
| JPG | 72 точек на дюйм | 666.3 KB | 1400 px × 933 px | Формат RGB | Загрузить |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



