Мы используем файлы cookie для постоянной оптимизации нашего веб-сайта. Продолжая использовать этот сайт, вы соглашаетесь на использование файлов cookie. Для дополнительной информации обратитесь к нашим Условиям для пользователей. OK

Фотоматериалы

Вернуться к поиску

Castoro Sei Stinger

In February 2010 at the Port of Rotterdam, the Castoro Sei (C6) was fitted with a new stinger (external ramp) for the Nord Stream project. This pictures shows the stinger (white) before it was installed.
The stinger is attached to the bow of the pipelay vessel and supports the pipeline during laying. This way, stress on the pipeline during laying is controlled and remains acceptable limits The pipelay parameters will be controlled at all times so that the tension remains within the limits determined by the installation engineering analysis at all times. Please note: The stinger is attached to the bow of the Castoro Sei - she actually moves backwards during pipelaying, with the stern facing forward!

Категории

Суда › Castoro Sei

Источник

Nord Stream AG

Дата

20 февраля 2010 г.

Загрузки

Тип файла Разрешение Размер файла Размер изображения Цветопередача
JPG 300 точек на дюйм 16.3 Mб 3543 px × 2362 px Формат CMYK Загрузить
JPG 300 точек на дюйм 4.5 Mб 3543 px × 2362 px Формат RGB Загрузить
JPG 72 точек на дюйм 1.1 Mб 1400 px × 933 px Формат RGB Загрузить

Условия использования

Информация на сайте является корректной и актуальной на момент ее публикации. Однако компания Nord Stream AG не несет ответственности за точность данной информации, так как все прогнозы и планы основаны на теоретических оценках, которые допускают долю неопределенности и могут меняться под влиянием внешних обстоятельств.

Подробнее