Фотоматериалы
Castoro Sei: Tensioners Keep Pipeline in Place
During the pipelaying process, the pipe is held by a number of heavy-duty tensioners that retain it in position against installation stresses. Each tensioner consists of an upper and a lower track, which look similar to tank tracks. The track loops hold the pipeline in place by applying pressure. On the Castoro Sei, there are three tensioners that control the pipeline's movement by maintaining a set tension on the pipe string as it is installed onto the seabed. They each can exert 110 tonnes of operational pressure.
Загрузки
| Тип файла | Разрешение | Размер файла | Размер изображения | Цветопередача | |
| JPG | 300 точек на дюйм | 17.0 Mб | 2362 px × 3543 px | Формат CMYK | Загрузить |
| JPG | 300 точек на дюйм | 5.2 Mб | 2362 px × 3543 px | Формат RGB | Загрузить |
| JPG | 72 точек на дюйм | 1.0 Mб | 933 px × 1400 px | Формат RGB | Загрузить |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



