External Inspection of Line 1 by ROV

The external ROV inspections along the entire length of Line 1 took place from mid-June through mid-October 2012. This was an actual structural survey to confirm the position, depth and condition of the pipeline within the first year of operation. This provided the baseline data against which the results of subsequent inspections can be compared. Line 1 was visually surveyed with underwater cameras mounted on an ROV. It was also equipped with high precision survey sensors to accurately derive the position and depth of the pipelines relative to the adjacent seabed and intervention works. This process is extremely important for the assessment and monitoring of pipeline free spans. Where the pipeline is buried in trenched/intervention areas or has been naturally embedded into the seabed over time, an electromagnetic pipe tracking system to determine the position and depth of the pipeline beneath the seabed.

Категории

Эксплуатация

Источник

Nord Stream AG

Дата

22 августа 2012 г.

Загрузки

Тип файла Разрешение Размер файла Размер изображения Цветопередача
JPG 300 точек на дюйм 20.5 Mб 4000 px × 2666 px Формат CMYK Загрузить
JPG 300 точек на дюйм 7.1 Mб 4000 px × 2666 px Формат RGB Загрузить
JPG 72 точек на дюйм 1.1 Mб 1400 px × 933 px Формат RGB Загрузить

Условия использования

Информация на сайте является корректной и актуальной на момент ее публикации. Однако компания Nord Stream AG не несет ответственности за точность данной информации, так как все прогнозы и планы основаны на теоретических оценках, которые допускают долю неопределенности и могут меняться под влиянием внешних обстоятельств.

Подробнее