Фотоматериалы
Gas Begins to Flow through Line 2
On October 8, 2012, gas began to flow through Line 2 of Nord Stream’s twin pipeline system. A push of a button at the control centre at the Gazprom Gas Complex Preparation Station made this possible. The screen above the gentlemen on stage depicts that gas is flowing through Line 2. Together the two pipelines are now capable of delivering 55 billion cubic metres of gas a year to the European gas grid. Nord Stream consortium heads were at the event to celebrate gas flowing through the twin pipeline system. From left to right: Jean-François Cirelli, Vice President, GDF SUEZ; Paul van Gelder, Chairman of the Executive Board and CEO of N.V. Nederlandse Gasunie; Dr. Bernhard Reutersberg, Member of the Management Board of E.ON AG; Dr. Harald Schwager, Member of the Management Board of BASF SE; Sergei Ivanov, Chief of Staff of the Russian Presidential Administration; Alexei Miller, Deputy Chairman of the Board of Directors and Chairman of the Management Committee, OAO Gazprom; Gerhard Schröder, Chairman of the Nord Stream Shareholders’ Committee and Former Chancellor of the Federal Republic of Germany; and Matthias Warnig, Managing Director, Nord Stream AG.
Загрузки
| Тип файла | Разрешение | Размер файла | Размер изображения | Цветопередача | |
| JPG | 300 точек на дюйм | 14.9 Mб | 4000 px × 2666 px | Формат CMYK | Загрузить |
| JPG | 300 точек на дюйм | 5.6 Mб | 4000 px × 2666 px | Формат RGB | Загрузить |
| JPG | 72 точек на дюйм | 739.2 KB | 1400 px × 933 px | Формат RGB | Загрузить |
Photo may be used to accompany news-related reports about Nord Stream provided the source (Nord Stream AG) is mentioned.



