Мы используем файлы cookie для постоянной оптимизации нашего веб-сайта. Продолжая использовать этот сайт, вы соглашаетесь на использование файлов cookie. Для дополнительной информации обратитесь к нашим Условиям для пользователей. OK

Фотоматериалы

Вернуться к поиску

The Landfall of the Nord Stream Pipeline in Germany

The terminating point of the Nord Stream Pipeline is located at the energy hub Lubminer Heide near Greifswald, which covers an area of about 12 hectares, including the receiving terminal of the connecting pipelines OPAL and NEL. The onshore part of Nord Stream’s twin pipelines was built to include an omega-shaped expansion loop, capable of compensating for any possible pipeline expansion or contractions due to pressure and temperature variations. This is connected to huge valves, and the pipeline eventually ends in the PIG (Pipeline Inspection Gauges) trap. The arriving gas is fed into the receiving station of OPAL and NEL via a cross-connection. The gas is then prepared for further transport through the connecting pipelines.

Источник

Nord Stream AG

Дата

18 марта 2015 г.

Загрузки

Тип файла Разрешение Размер файла Размер изображения Цветопередача
JPG 300 точек на дюйм 15.3 Mб 3456 px × 2304 px Формат CMYK Загрузить
JPG 300 точек на дюйм 4.3 Mб 3456 px × 2304 px Формат RGB Загрузить
JPG 72 точек на дюйм 987.7 KB 1400 px × 933 px Формат RGB Загрузить

Условия использования

Информация на сайте является корректной и актуальной на момент ее публикации. Однако компания Nord Stream AG не несет ответственности за точность данной информации, так как все прогнозы и планы основаны на теоретических оценках, которые допускают долю неопределенности и могут меняться под влиянием внешних обстоятельств.

Подробнее