Видеоматериалы
Interview: Preparations for Bringing Line 1 Online
Ruurd Hoekstra, Deputy Director Construction for Nord Stream AG, explains that only a few steps remain before Line 1 can be brought online. Hoekstra highlights the significance of the overall project for meeting Europe’s energy needs.
Загрузки
| H.264 (HD) | 1024 × 576 | 16.1 Mб | |
| H.264 | 720 × 404 | 8.3 Mб | |
| VP8 | 720 × 404 | 6.0 Mб | |
| MPEG2 | 1024 × 576 | 142.9 Mб |
Видеоматериалы могут быть использованы СМИ только со ссылкой на источник (Nord Stream AG).



