Transparency/REMIT
In compliance with Regulation (EU) Nr. 1227/2011 (Regulation on Wholesale Energy Market Integrity and Transparency – REMIT), as well as with Regulation (EC) No 715/2009 of the European Parliament and of the Council on conditions for access to the natural gas transmission networks, European transmission system operators are required to publish a range of information.
Various operational data relating to the Nord Stream Pipeline can be accessed via the following link: Network data
17 December 2020 |
|
Annual maintenance works of Nord Stream Pipeline scheduled for July 2021 |
|
Message Type: |
New |
Company: |
Nord Stream AG |
Market participant EIC |
21X000000001398N |
Affected Point: |
Greifswald Exit |
Asset type affected: |
Nord Stream |
Asset Unit affected: |
Nord Stream |
Time of capacity change: |
13/07/21 06:00 to 25/07/21 06:00 |
Causes: |
Planned maintenance measures |
Flow capacity influenced ( kWh/d): |
1’756’800’000 |
Available capacity during outage or unplanned event (kWh/d): |
0 |
|
|
Additional Information: |
|
From 13 July to 25 July 2021, Nord Stream AG will temporarily shut down both lines of its gas pipeline system for annual routine maintenance works. |