In compliance with Regulation (EU) Nr. 1227/2011 (Regulation on Wholesale Energy Market Integrity and Transparency ­– REMIT), as well as with Regulation (EC) No 715/2009 of the European Parliament and of the Council on conditions for access to the natural gas transmission networks, European transmission system operators are required to publish a range of information.

Various operational data relating to the Nord Stream Pipeline can be accessed via the following link: Network data

18 December 2019

 

Annual maintenance works of Nord Stream Pipeline scheduled for July 2020

 

Message Type: 

New

Company: 

Nord Stream AG

Market participant EIC

21X000000001398N

Affected Point: 

Greifswald Exit

Asset type affected: 

Nord Stream

Asset Unit affected: 

Nord Stream

Time of capacity change: 

14/07/20 06:00 to 26/07/20 06:00

Causes: 

Planned maintenance measures

Flow capacity influenced ( kWh/d): 

1’756’800’000

Available capacity during outage or unplanned event (kWh/d): 

0

 

 

Additional Information: 

 

From 14 July to 26 July 2020, Nord Stream AG will temporarily shut down both lines of its gas pipeline system for annual routine maintenance works.